Q) EGTT/QMXLC/IV/M /A /000/999/5227N00145W
A) EGBB
B) 21/11/30 11:23 C) 21/12/31 23:59
E) TWY TANGO CLOSED BETWEEN T2 AND T4
Q) EGTT/QOBCE/IV/M /AE /000/004/5226N00144W
A) EGBB
B) 21/10/18 00:01 C) 22/01/18 23:59
E) CONSTRUCTION/PLANT EQUIPMENT OPR 522620N 0014401W (147DEG(M) 1923M FM BIRMINGHAM ARP). MAX HGT 26FT AGL/383FT AMSL
Q) EGTT/QOBCE/IV/M /AE /000/007/5225N00147W
A) EGBB
B) 21/10/23 00:00 C) 21/12/31 00:00
E) SUPPLEMENT 002/2021 HAS BEEN EXTENDED UNTIL 31 DECEMBER 2021 WHEN THE NEW CRANE OPERATING IN THE VICINITY OF THE AIRPORT WILL BE INCORPORATED IN THE AIP.
Q) EGTT/QPATT/I/BO /A /000/999/5227N00145W
A) EGBB
B) 21/12/02 00:00 C) 21/12/15 23:59
E) TRIGGER NOTAM – PERM AIRAC AIP AMDT 12/21 WEF 02 DEC 21. VIA FRA REPLACES AIRWAY DESIGNATORS. AD 2 EGBB 7-2